Gardner Denver compressor installation

Compressed Air System Design, Installation and Piping in Southern California

We design and install complete compressed air systems: sizing, compressor, dryers and filters, storage, piping and startup. Most of our work is in Los Angeles, Orange, Riverside and San Bernardino counties.

Chicago PneumaticPowerexPneumatechMark CompressorsDonaldson

What a Full System Installation Covers

Sizing, equipment, dryers and filters, storage, piping, controls and startup, all from one team.

  • Load assessment and equipment selection

    We measure your air demand first: CFM at the point of use, peak demand and run times, using the method in our air compressor sizing guide. Most plants get an oil-flooded rotary screw; piston, scroll or oil-free go where the job needs them. Variable speed goes in when your demand swings enough to pay for it. With more than one compressor, we set up sequencing so they share run hours.

  • Air treatment selection

    Refrigerated dryers for general plant air, desiccant where you need a -40°F dew point or lower. The dew point should sit 20°F below the coldest temperature your piping sees. Filters are matched to ISO 8573-1 air quality classes. See dryer selection and moisture troubleshooting.

  • Storage and receiver sizing

    At least 10 gallons per CFM of the largest trim compressor, split about one-third wet (before the dryer) and two-thirds dry (after). Too little storage pushes system pressure up and wastes energy.

  • Distribution piping

    Main lines sized to keep air under 30 ft/sec and wet lines under 20 ft/sec, so you don’t lose pressure or carry water downstream. Aluminum or black iron, never PVC. More on piping.

  • Controls and commissioning

    At startup we set pressure, load and unload points, safety shutdowns and sequencing, then record the baseline your maintenance tracks from then on.

Compressed air piping and distribution

Headers, loops, branch lines and drops for new plants, expansions and equipment moves. We quote piping on its own or with the rest of the system.

Discuss a Piping Project

  • New lines, expansions and upgrades

    Main headers and loops, new machine drops, branch extensions and rerouting after layout changes. We check the old pipe’s condition and spare capacity before extending it, and set isolation zones so the work fits around production.

  • Sizing, layout and pressure drop

    We size from CFM at your operating pressure and peak demand, not compressor horsepower, and count the equivalent length of fittings, valves and bends. Every project gets a pressure-drop target that we check at commissioning.

  • Finding the real restriction

    Low pressure at a machine isn’t always the pipe. We measure under normal load at the compressor, dryer, header and machine inlet, use a piping schematic to pick the points, and watch for short-duration demand at single machines. Turning the compressor up hides the problem and costs energy. Not sure why pressure is low? Start with a compressed air system assessment.

  • Materials and condensate

    Aluminum, copper, carbon steel or stainless, with every part rated for your pressure and temperature. We place takeoffs and low points to keep condensate out of your machines, with drains you can reach.

  • Tie-in and shutdown

    We plan the shutdown window, isolation and lockout, access and other trades before anything is scheduled. After tie-in come leak checks, pressure checks under load, valve labels and a handover record. The proposal says who supplies the materials and who installs.

  • Further reading

    From Compressed Air Best Practices: Compressed Air Piping Distribution Systems and Pressure Loss Solutions for the Last 30 Feet.

Getting the System Design Right

Over 10 years, electricity is about 76 percent of what a 75 HP system costs to own, and the purchase price about 12 percent (U.S. Department of Energy). Sizing decides the power bill.

An undersized system runs flat out, runs hot and can’t keep up at peak. An oversized fixed-speed compressor sits unloaded and still draws 35 to 40 percent of full-load power. We carry several brands, so we pick for your demand, not to push one product line.

Replacing an Old Compressor

Most compressors reach repair-or-replace around 8 to 10 years or 40,000 to 50,000 hours. The system is down for the swap anyway, so that’s the time to fix piping that’s too small, a fixed-speed unit on a swinging load, or too little storage.

A system assessment before you spec the replacement keeps you from copying the old unit’s mistakes.

How it works

Gardner Denver compressor installation
Toolytics field work. See the project photo gallery.
  1. Initial consultation

    Call (844) 310-8665 or send a request. The equipment type and location are enough to start. We won’t spec equipment over the phone.

  2. Site assessment and load survey

    We visit, document the current system or the empty space, and measure demand. If a full system assessment makes sense first, we’ll quote it separately.

  3. System scope and proposal

    You get a proposal with the equipment, specs, price and current lead times. Nothing is ordered until you approve it.

  4. Installation

    We set the equipment to manufacturer specs, connect the piping, and set up the dryers, filters and controls.

  5. Commissioning and baseline documentation

    We start it under load, record pressure, temperature, power and dew point, and confirm it runs to spec before we leave. That baseline is what your planned maintenance tracks.

What to send for a quote

Send what you have: site ZIP and target date, the equipment or application, CFM and pressure, shutdown window, supply-only or installed scope, and for piping the rough distances, number of drops and current pipe material. We’ll tell you what still needs measuring. Tell us about drawings or bid documents and we’ll set up a way to get them.

Serving Los Angeles, Orange County, and the Inland Empire

Most of our installation work is here:

Los Angeles County

Vernon, City of Industry, Carson, Long Beach, Santa Fe Springs, Torrance, El Monte, and Compton.

Orange County

Anaheim, Santa Ana, Garden Grove, Fullerton, Buena Park, and Brea.

Inland Empire

Ontario, Fontana, Riverside, Rancho Cucamonga, Moreno Valley, San Bernardino, and Pomona.

Inland Empire heat. Compressor rooms here often hit 95 to 100°F in summer. A dryer sized without that in mind may not hold your dew point in July and August, so we size for it.

We also do compressed air installation in Las Vegas and Clark County. California is fully staffed, Nevada has active equipment and service support, and Arizona equipment supply and project-scoped installation are quoted for each site.

Something not right?

Won’t start, keeps tripping, low pressure, water or oil in the lines, running hot. Tell us what it’s doing.

Call (844) 310-8665

Frequently Asked Questions

Common questions about installation and piping

How long does a compressed air system installation take?

It depends on the job. A straight compressor swap with good existing piping and treatment often takes one to two days. A full system with new piping, tank, dryers and controls usually takes three to five days on site, plus equipment lead time. You get a timeline in the proposal.

How do you determine the right size compressor for a facility?

We measure first. A site visit and load survey gives us real CFM at the point of use, peak periods and run times. That drives the spec, not a rule of thumb. A wrong-size compressor costs you for years.

What is the difference between a VSD and a fixed-speed compressor, and which one do I need?

Fixed-speed runs at full load or unloaded. Variable speed (VSD) changes motor speed to match demand, which saves energy when demand swings. Steady demand all shift? Fixed-speed may be right. Demand that changes by shift or season? VSD usually pays off. CAGI says VSD saves energy in many applications, not all, so we check your load first.

Will larger piping solve low pressure at our tools?

Maybe, if the piping is the restriction. Measure pressure under normal demand at the compressor, dryer and filters, header and critical machines. Clogged filters, small hoses, leaks, controls or too little compressor can also cause it. Find the cause before picking pipe sizes.

Should we use a loop or a straight header?

A loop feeds demand from two directions and makes future drops easier. A straight header can suit a smaller or long, narrow building. It depends on layout, demand, equivalent length, isolation and growth plans. A loop alone doesn’t guarantee enough pressure.

Can Toolytics work with our general or mechanical contractor?

Yes. The proposal spells out materials only versus our installation or subcontract scope, and who handles drawings, permits, supports, electrical, shutdown coordination, testing and startup. What we can install depends on the location and site.

Should we assess the current system before replacing the compressor?

Usually, yes, especially if the piping or storage was sized for a different load. An assessment shows your real demand and any piping problems to fix during the same shutdown, so you don’t just copy the old unit’s specs. See our system assessments page.

Request an Installation Consultation

We start with a site visit and load survey and build the system from there. Fill out the form and we’ll follow up within one business day, or call (844) 310-8665.

Once it’s running, a maintenance agreement keeps it at spec.